Partial Road Closure on Al Khaleej Al Arabi Street Bridge in Abu Dhabi (13–15 September 2025)

businesnewswire@gmail.com
2 Min Read

Abu Dhabi, UAE – The Department of Municipalities and Transport (DMT) has announced a partial road closure on the bridge at Al Khaleej Al Arabi Street in Abu Dhabi.

The closure will be in effect from Saturday, 13 September 2025, until Monday, 15 September 2025, as part of ongoing road maintenance and infrastructure upgrades aimed at improving traffic flow and road safety in the capital.

Key Details of the Partial Road Closure on Al Khaleej Al Arabi St, Abu Dhabi

  • Location: Bridge at Al Khaleej Al Arabi Street, Abu Dhabi
  • Closure Type: Partial road closure
  • Duration: From 13 September 2025 (Saturday) to 15 September 2025 (Monday)
  • Purpose: Road maintenance and infrastructure improvements

Traffic Advisory

Motorists are advised to plan their journeys accordingly and follow the official detour signs placed along the affected routes.

Authorities have confirmed that traffic officers and smart monitoring systems will be deployed to ensure smooth traffic flow and minimize congestion during the closure period.

For real time traffic updates, drivers can check the official Abu Dhabi DMT channels or use navigation apps like Google Maps and Waze for alternative routes.

Frequently Asked Questions

When is the partial road closure on Al Khaleej Al Arabi Street?

From Saturday, 13 September 2025, to Monday, 15 September 2025.

Which part of the road is affected?

The closure affects the bridge on Al Khaleej Al Arabi Street in Abu Dhabi.

Why is the road closed?

For road maintenance and infrastructure upgrades to improve traffic flow and safety.

Are there detours or alternative routes?

Yes, official detour signs will be placed along affected routes, and real-time updates will be available on Abu Dhabi DMT channels.

Share This Article
Leave a Comment

Leave a Reply

Your email address will not be published. Required fields are marked *